Ship from: HONGKONG
Date Code: Newest Date Code
Manufacturer lead time 6 weeks
Internal Part Number | EIS-CTV07RW-25-24AD | |
Lead Free Status / RoHS Status | Contains lead / RoHS non-compliant | |
Moisture Sensitivity Level (MSL) | 1 (Unlimited) | |
Production Status (Lifecycle) | In Production | |
Condition | New & Unused, Original Sealed | |
Standard Package | 1 | |
Category | Connectors, Interconnects | |
Family | Circular Connectors | |
Series | * | |
Weight | 0.001 KG | |
Application | Email for details | |
Alternative Part (Replacement) | CTV07RW-25-24AD | |
Related Links | CTV07RW, CTV07RW-25-24AD Datasheet, Amphenol Aerospace Operations Distributor |
![]() | MBA02040C2401FRP00 | RES 2.4K OHM 0.4W 1% AXIAL | datasheet.pdf | |
![]() | MCR03EZPFX5230 | RES SMD 523 OHM 1% 1/10W 0603 | datasheet.pdf | |
![]() | RG3216P-1150-W-T1 | RES SMD 115 OHM 0.05% 1/4W 1206 | datasheet.pdf | |
![]() | VI-J12-EZ-F4 | CONVERTER MOD DC/DC 15V 25W | datasheet.pdf | |
![]() | V150LS5PX1347 | VARISTOR 212V 2.5KA DISC 10MM | datasheet.pdf | |
![]() | HMC551LP4E | IC MIXER DBL-BAL HI IP3 24-QFN | datasheet.pdf | |
![]() | PV1S640NN | SWITCH PUSHBUTTON SPST-NO 2A 48V | datasheet.pdf | |
![]() | 852-10-048-10-001101 | CONN HDR 48POS 1.27MM T/H | datasheet.pdf | |
![]() | 09195206914 | CONN HEADER 20POS T/H | datasheet.pdf | |
![]() | VS-10ETF04FP-M3 | DIODE RECT 400V 10A TO-220FP | datasheet.pdf | |
![]() | 305042 | EJECTOR | datasheet.pdf | |
![]() | CTV06RW-11-99SA | CTV 7C 7#20 SKT PLUG | datasheet.pdf |