Ship from: HONGKONG
Date Code: Newest Date Code
Manufacturer lead time 6 weeks
| Internal Part Number | EIS-CTVP00RQW-21-75SB | |
| Lead Free Status / RoHS Status | Contains lead / RoHS non-compliant | |
| Moisture Sensitivity Level (MSL) | 1 (Unlimited) | |
| Production Status (Lifecycle) | In Production | |
| Condition | New & Unused, Original Sealed | |
| Standard Package | 1 | |
| Category | Connectors, Interconnects | |
| Family | Circular Connectors | |
| Series | * | |
| Weight | 0.001 KG | |
| Application | Email for details | |
| Alternative Part (Replacement) | CTVP00RQW-21-75SB | |
| Related Links | CTVP00RQ, CTVP00RQW-21-75SB Datasheet, Amphenol Aerospace Operations Distributor | |
![]() | 5610901070 | LED 5MM VERT HIEFF DIFF ORG PCMT | datasheet.pdf | |
![]() | 39100-1512 | Connector Eurostyle Terminal Strip Strip 12 Circuit 0.591" (15.00mm) | datasheet.pdf | |
![]() | AGM30DRMD | CONN EDGECARD 60POS .156 WW | datasheet.pdf | |
![]() | 381LQ222M180K052 | CAP ALUM 2200UF 20% 180V SNAP | datasheet.pdf | |
![]() | ATFC-0201-2N1-BT | FIXED IND 2.1NH 200MA 700 MOHM | datasheet.pdf | |
![]() | PHAP4673 | SWITCH PUSHBUTTON DPDT 0.1A 30V | datasheet.pdf | |
![]() | 316-87-109-41-018101 | Connector Socket 9 Position 0.100" (2.54mm) Gold Through Hole | datasheet.pdf | |
![]() | ATS-17A-69-C2-R0 | HEATSINK 45X45X20MM L-TAB T766 | datasheet.pdf | |
![]() | 51761-10002412CALF | PWRBLADE R/A LF REC | datasheet.pdf | |
![]() | 2-18032-7 | SCREW,SET,SOCKET HEAD,FLAT POINT | datasheet.pdf | |
![]() | ECSR125 | UL CLASS RK-5 TIME DELAY | datasheet.pdf | |
![]() | CN0967C18S11P9-240 | 26500 11C 10#16 1#2 P RECP SS | datasheet.pdf |