Ship from: HONGKONG
Date Code: Newest Date Code
Manufacturer lead time 6 weeks
| Internal Part Number | EIS-CTVP00RW-13-8JN-LC | |
| Lead Free Status / RoHS Status | Contains lead / RoHS non-compliant | |
| Moisture Sensitivity Level (MSL) | 1 (Unlimited) | |
| Production Status (Lifecycle) | In Production | |
| Condition | New & Unused, Original Sealed | |
| Standard Package | 1 | |
| Category | Connectors, Interconnects | |
| Family | Circular Connectors - Housings | |
| Series | * | |
| Weight | 0.001 KG | |
| Application | Email for details | |
| Alternative Part (Replacement) | CTVP00RW-13-8JN-LC | |
| Related Links | CTVP00RW-, CTVP00RW-13-8JN-LC Datasheet, Amphenol Aerospace Operations Distributor | |
![]() | 9T04021A6341DBHF3 | RES SMD 6.34KOHM 0.5% 1/16W 0402 | datasheet.pdf | |
![]() | 101-0994 | KIT APPLICATION MULTI-PORT S2E | datasheet.pdf | |
![]() | MMBTA93LT1G | TRANS PNP 200V 0.5A SOT-23 | datasheet.pdf | |
![]() | SFW10R-6STE1LF | CONN CIC TOP 10POS 1.00MM R/A | datasheet.pdf | |
![]() | SCM119000 | CONN TERM BLK 11POS 5.08MM VERT | datasheet.pdf | |
![]() | SM6T7V5CAY | TVS DIODE 6.4VWM 14.5VC SMB | datasheet.pdf | |
![]() | ERA-8AEB1212V | RES SMD 12.1K OHM 0.1% 1/4W 1206 | datasheet.pdf | |
![]() | RN55C1021BBSL | RES 1.02K OHM 1/8W .1% AXIAL | datasheet.pdf | |
![]() | 5941 SL002 | MULTI-PAIR 10COND 28AWG 500' | datasheet.pdf | |
![]() | C3365/16 500SF | CBL RIBN 16COND 0.050 GRAY 500' | datasheet.pdf | |
![]() | 1952600000 | LMZF 7/5/135 3.5OR | datasheet.pdf | |
![]() | HT02308000J0G | 508 TB SPRING CLAMP 45D | datasheet.pdf |