Ship from: HONGKONG
Date Code: Newest Date Code
Manufacturer lead time 6 weeks
| Internal Part Number | EIS-CTVP00RW-25-187PD-LC | |
| Lead Free Status / RoHS Status | Contains lead / RoHS non-compliant | |
| Moisture Sensitivity Level (MSL) | 1 (Unlimited) | |
| Production Status (Lifecycle) | In Production | |
| Condition | New & Unused, Original Sealed | |
| Standard Package | 1 | |
| Category | Connectors, Interconnects | |
| Family | Circular Connectors - Housings | |
| Series | * | |
| Weight | 0.001 KG | |
| Application | Email for details | |
| Alternative Part (Replacement) | CTVP00RW-25-187PD-LC | |
| Related Links | CTVP00RW-2, CTVP00RW-25-187PD-LC Datasheet, Amphenol Aerospace Operations Distributor | |
![]() | LT1715CMS#PBF | IC COMPARATOR 150MHZ DUAL 10MSOP | datasheet.pdf | |
![]() | FMM22DSEI-S243 | CONN EDGECARD 44POS .156 EYELET | datasheet.pdf | |
![]() | MCR18EZHJLR15 | RES SMD 0.15 OHM 5% 1/4W 1206 | datasheet.pdf | |
![]() | IXTV72N30T | MOSFET N-CH 300V 72A PLUS220 | datasheet.pdf | |
![]() | 5-1879633-3 | RES 121 OHM 1/2W 0.5% AXIAL | datasheet.pdf | |
![]() | TL-M2ME1 | PROXIMITY SWITCH 2MM NPN NO | datasheet.pdf | |
![]() | VE-B3R-EU-F4 | CONVERTER MOD DC/DC 7.5V 200W | datasheet.pdf | |
![]() | CMF551M4000GKEK | RES 1.4M OHM 1/2W 2% AXIAL | datasheet.pdf | |
![]() | QBM-120/50-QB48IN-5 | HEATSHRINK 120/50MM-48" | datasheet.pdf | |
![]() | 75160-102R04LF | HEADER BERGSTIK | datasheet.pdf | |
![]() | 620307 | TOOL DIE SET M22520/5-39 | datasheet.pdf | |
![]() | G125-FC41005L0-0300F | 1.25MM F/F 10POS 32AWG 300MM | datasheet.pdf |