Ship from: HONGKONG
Date Code: Newest Date Code
Manufacturer lead time 6 weeks
| Internal Part Number | EIS-ISL43144IV-T | |
| Lead Free Status / RoHS Status | Contains lead / RoHS non-compliant | |
| Moisture Sensitivity Level (MSL) | 1 (Unlimited) | |
| Production Status (Lifecycle) | Obsolete / Discontinued | |
| Condition | New & Unused, Original Sealed | |
| Standard Package | 2,500 | |
| Category | Integrated Circuits (ICs) | |
| Family | Interface - Analog Switches, Multiplexers, Demultiplexers | |
| Series | - | |
| Packaging | Tape & Reel (TR) | |
| Function | Switch | |
| Circuit | 4 x SPST - NO | |
| On-State Resistance | 20 Ohm | |
| Voltage Supply Source | Single, Dual Supply | |
| Voltage - Supply, Single/Dual (±) | 2 V ~ 12 V, ±2 V ~ 6 V | |
| Current - Supply | 10nA | |
| Operating Temperature | -40°C ~ 85°C | |
| Mounting Type | Surface Mount | |
| Package / Case | 16-TSSOP (0.173", 4.40mm Width) | |
| Supplier Device Package | 16-TSSOP | |
| Weight | 0.001 KG | |
| Application | Email for details | |
| Alternative Part (Replacement) | ISL43144IV-T | |
| Related Links | ISL431, ISL43144IV-T Datasheet, Intersil Distributor | |
![]() | 1840-28K | FIXED IND 8.2UH 560MA 400 MOHM | datasheet.pdf | |
![]() | 1737150000 | CABLE PLUG BLANK M20 BRASS EXE | datasheet.pdf | |
![]() | THS6002CDWPRG4 | IC DVR/RCVR DUAL DIFF 20SOPWRPAD | datasheet.pdf | |
![]() | CSRF1206FT5L00 | RES SMD 0.005 OHM 1% 1/2W 1206 | datasheet.pdf | |
![]() | 0026033171 | KK 156 CRIMP HOUSING 17POS | datasheet.pdf | |
![]() | RWR80SR332FMB12 | RES 0.332 OHM 2W 1% WW AXIAL | datasheet.pdf | |
![]() | 1930380000 | SV 7.62HP/02/90F 3.5SN BK BX | datasheet.pdf | |
![]() | ABB45DYHR | CONN EDGE DUAL .050 TH 90POS | datasheet.pdf | |
![]() | 0387598129 | SR BTS PCCS10AT 9 ASY | datasheet.pdf | |
![]() | SP-48-B | TRANSER 7.5K CT/ 12 OHM AUDIO | datasheet.pdf | |
![]() | CWR26HB106JCFZ\TR | CAP TANT 10UF 5% 15V 2214 | datasheet.pdf | |
![]() | GRM21BR71H224K | Capacitors Inductors Filters... | datasheet.pdf |