Ship from: HONGKONG
Date Code: Newest Date Code
Manufacturer lead time 6 weeks
| Internal Part Number | EIS-LJT06RE-15-4P | |
| Lead Free Status / RoHS Status | Contains lead / RoHS non-compliant | |
| Moisture Sensitivity Level (MSL) | 1 (Unlimited) | |
| Production Status (Lifecycle) | In Production | |
| Condition | New & Unused, Original Sealed | |
| Standard Package | 1 | |
| Category | Connectors, Interconnects | |
| Family | Circular Connectors | |
| Series | * | |
| Weight | 0.001 KG | |
| Application | Email for details | |
| Alternative Part (Replacement) | LJT06RE-15-4P | |
| Related Links | LJT06R, LJT06RE-15-4P Datasheet, Amphenol Aerospace Operations Distributor | |
![]() | ADR01BUJZ-REEL7 | IC VREF SERIES 10V TSOT23-5 | datasheet.pdf | |
![]() | M2022L1L3W01 | SWITCH TOGGLE DPDT 6A 125V | datasheet.pdf | |
![]() | RG3216P-3900-C-T5 | RES SMD 390 OHM 0.25% 1/4W 1206 | datasheet.pdf | |
![]() | EMC06DRYS-S93 | CONN EDGECARD 12POS DIP .100 SLD | datasheet.pdf | |
![]() | 293D225X0050D2TE3 | CAP TANT 2.2UF 50V 20% 2917 | datasheet.pdf | |
![]() | RPC2010JT220R | RES SMD 220 OHM 5% 3/4W 2010 | datasheet.pdf | |
![]() | 1761687-3 | CONN HEADER 10POS VERT .100 GOLD | datasheet.pdf | |
![]() | REC5-4805DRW/H6/A/M/CTRL | CONV DC/DC 5W 36-72VIN +/-05VOUT | datasheet.pdf | |
![]() | VE-J54-CX-F2 | CONVERTER MOD DC/DC 48V 75W | datasheet.pdf | |
![]() | RN70C1072FBSL | RES 10.7K OHM 3/4W 1% AXIAL | datasheet.pdf | |
![]() | MSP430G2230QDEP | IC MCU 16BIT 2KB FLASH 8SOIC | datasheet.pdf | |
![]() | 21B-I155B-C | PUSH MOUNT CABLE TIES | datasheet.pdf |