Ship from: HONGKONG
Date Code: Newest Date Code
Manufacturer lead time 6 weeks
| Internal Part Number | EIS-LJTPQ00RT-25-37S-014 | |
| Lead Free Status / RoHS Status | Contains lead / RoHS non-compliant | |
| Moisture Sensitivity Level (MSL) | 1 (Unlimited) | |
| Production Status (Lifecycle) | In Production | |
| Condition | New & Unused, Original Sealed | |
| Standard Package | 1 | |
| Category | Connectors, Interconnects | |
| Family | Circular Connectors | |
| Series | * | |
| Weight | 0.001 KG | |
| Application | Email for details | |
| Alternative Part (Replacement) | LJTPQ00RT-25-37S-014 | |
| Related Links | LJTPQ00RT-, LJTPQ00RT-25-37S-014 Datasheet, Amphenol Aerospace Operations Distributor | |
![]() | 1627580000 | TERM BLOCK PLUG 23POS STR 5.08MM | datasheet.pdf | |
![]() | AD8067ARTZ-R2 | IC OPAMP VF R-R PREC LN SOT23-5 | datasheet.pdf | |
![]() | FWX-80A | FUSE 80A 250V BOLT-ON | datasheet.pdf | |
![]() | MC9S08AC48CPUE | IC MCU 8BIT 48KB FLASH 64LQFP | datasheet.pdf | |
![]() | 1622574-1 | RES 7.50 OHM 0.6W 1% AXIAL | datasheet.pdf | |
![]() | VI-J6T-IZ-F1 | CONVERTER MOD DC/DC 6.5V 25W | datasheet.pdf | |
![]() | 2UDCP727318FFTC | ELECTRICAL ENCLOSURE | datasheet.pdf | |
![]() | LCC4-14AF-L | LUG COPPER 2 HOLE | datasheet.pdf | |
![]() | EC6288-000 | MARKERS | datasheet.pdf | |
![]() | 18206-1 | RELAY,POWER | datasheet.pdf | |
![]() | LP210312 | CONN BARRIER STRIP 12CIRC .375 | datasheet.pdf | |
![]() | 97-3100A24-9SZ | AB 2C 2#4 SKT RECP | datasheet.pdf |