Ship from: HONGKONG
Date Code: Newest Date Code
Manufacturer lead time 6 weeks
| Internal Part Number | EIS-MS27468E23B21P | |
| Lead Free Status / RoHS Status | Contains lead / RoHS non-compliant | |
| Moisture Sensitivity Level (MSL) | 1 (Unlimited) | |
| Production Status (Lifecycle) | In Production | |
| Condition | New & Unused, Original Sealed | |
| Standard Package | 1 | |
| Category | Connectors, Interconnects | |
| Family | Circular Connectors | |
| Series | * | |
| Weight | 0.001 KG | |
| Application | Email for details | |
| Alternative Part (Replacement) | MS27468E23B21P | |
| Related Links | MS27468, MS27468E23B21P Datasheet, Amphenol Aerospace Operations Distributor | |
![]() | PTC32SBAN | CONN HEADER .100 SINGL R/A 32POS | datasheet.pdf | |
![]() | RMCF0805FT27R4 | RES SMD 27.4 OHM 1% 1/8W 0805 | datasheet.pdf | |
![]() | MY4N-D2 DC125 (S) | RELAY GEN PURPOSE 4PDT 3A 125V | datasheet.pdf | |
![]() | W22-3K3JI | RES 3.3K OHM 7W 5% AXIAL | datasheet.pdf | |
![]() | PE0140BJ10136BF1 | CAP CER 100PF 15KV R7 DISK | datasheet.pdf | |
![]() | RER70F35R7MCSL | RES CHAS MNT 35.7 OHM 1% 20W | datasheet.pdf | |
![]() | M55342H06B1B69RT5 | RES SMD 1.69KOHM 0.1% 0.15W 0805 | datasheet.pdf | |
![]() | 7203SPDZQE | SWITCH TOGGLE DPDT 5A 120V | datasheet.pdf | |
![]() | 3046L-3-502 | POT 5K OHM .125W | datasheet.pdf | |
![]() | 04-024-115 | DECI-CENTER JUMPERS 4POS | datasheet.pdf | |
![]() | DBM9H4PNK87 | D-SUB COMBO 9C 4 COAX K87 | datasheet.pdf | |
![]() | IEGS6-1-62-1.00-01-V | CIR BRKR MAG-HYDR LEVER 1A | datasheet.pdf |