Ship from: HONGKONG
Date Code: Newest Date Code
Manufacturer lead time 6 weeks
| Internal Part Number | EIS-MS27473T22B21SA-CGMSS4 | |
| Lead Free Status / RoHS Status | Contains lead / RoHS non-compliant | |
| Moisture Sensitivity Level (MSL) | 1 (Unlimited) | |
| Production Status (Lifecycle) | In Production | |
| Condition | New & Unused, Original Sealed | |
| Standard Package | 1 | |
| Category | Connectors, Interconnects | |
| Family | Circular Connectors | |
| Series | * | |
| Weight | 0.001 KG | |
| Application | Email for details | |
| Alternative Part (Replacement) | MS27473T22B21SA-CGMSS4 | |
| Related Links | MS27473T22B, MS27473T22B21SA-CGMSS4 Datasheet, Amphenol Aerospace Operations Distributor | |
![]() | UCC283TD-3 | IC REG LDO 3.3V 3A DDPAK | datasheet.pdf | |
![]() | MCR18EZPF6490 | RES SMD 649 OHM 1% 1/4W 1206 | datasheet.pdf | |
![]() | HC2-HP-AC6V-F | RELAY GENERAL PURPOSE DPDT 7A 6V | datasheet.pdf | |
![]() | R82EC1100AA50J | CAP FILM 1000PF 5% 100VDC RADIAL | datasheet.pdf | |
![]() | 903-640 | RND SPACER 0.047" NYLON 16.26MM | datasheet.pdf | |
![]() | 0015453380 | Connector Receptacle 80 Position 0.100" (2.54mm) Gold Surface Mount | datasheet.pdf | |
![]() | AML51-E10W | BUTTON FOR SWES AND INDICATORS | datasheet.pdf | |
![]() | MLP2012VR47MT0S1 | FIXED IND 470NH 1.1A 110 MOHM | datasheet.pdf | |
![]() | 4470R-49J | FIXED IND 10MH 80MA 80 OHM TH | datasheet.pdf | |
![]() | MLTFC4H-LP316RD | CABLE TIE MLT HEAVY | datasheet.pdf | |
![]() | 4561-2 | POSITIONER STATIC MS | datasheet.pdf | |
![]() | 97-3107A22-9PY | AB 3C 3#12 PIN PLUG | datasheet.pdf |