Ship from: HONGKONG
Date Code: Newest Date Code
Manufacturer lead time 6 weeks
| Internal Part Number | EIS-97-3106B24-9PX-417 | |
| Lead Free Status / RoHS Status | Contains lead / RoHS non-compliant | |
| Moisture Sensitivity Level (MSL) | 1 (Unlimited) | |
| Production Status (Lifecycle) | In Production | |
| Condition | New & Unused, Original Sealed | |
| Standard Package | 1 | |
| Category | Connectors, Interconnects | |
| Family | Circular Connectors | |
| Series | * | |
| Weight | 0.001 KG | |
| Application | Email for details | |
| Alternative Part (Replacement) | 97-3106B24-9PX-417 | |
| Related Links | 97-3106B2, 97-3106B24-9PX-417 Datasheet, Amphenol Industrial Distributor | |
![]() | SN74HC04DBR | IC HEX INVERTER 14-SSOP | datasheet.pdf | |
| 160864-2 | Connector Quick Connect Receptacle 17-20 AWG 0.110" (2.79mm) Crimp | datasheet.pdf | ||
![]() | 1620-3-7.5A | CIR BRKR THRM 7.5A 24VDC | datasheet.pdf | |
![]() | FXO-HC736-8 | OSCILLATOR XO 8.000MHZ HCMOS SMD | datasheet.pdf | |
![]() | 166996-3 | CONN D-SUB SOCKET 32-28AWG CRIMP | datasheet.pdf | |
![]() | RWR80S1170DRRSL | RES 117 OHM 2W 0.5% WW AXIAL | datasheet.pdf | |
![]() | 7201SY9V3BE | SWITCH TOGGLE DPDT 0.4VA 20V | datasheet.pdf | |
![]() | SW11 WH008 | TUBING SPIRAL WRAP WH 25' | datasheet.pdf | |
![]() | C3JK7031CG1 | RACK JOINING KIT | datasheet.pdf | |
![]() | M4A3-32/32-10JC | IC CPLD 32MC 10NS 44PLCC | datasheet.pdf | |
![]() | PHP00603E7410BBT1 | RES SMD 741 OHM 0.1% 3/8W 0603 | datasheet.pdf | |
![]() | L-11-6-NB | CONN RING INSUL | datasheet.pdf |