Ship from: HONGKONG
Date Code: Newest Date Code
Manufacturer lead time 6 weeks
| Internal Part Number | EIS-97-3107A18-1P-417-940 | |
| Lead Free Status / RoHS Status | Contains lead / RoHS non-compliant | |
| Moisture Sensitivity Level (MSL) | 1 (Unlimited) | |
| Production Status (Lifecycle) | In Production | |
| Condition | New & Unused, Original Sealed | |
| Standard Package | 1 | |
| Category | Connectors, Interconnects | |
| Family | Circular Connectors | |
| Series | * | |
| Weight | 0.001 KG | |
| Application | Email for details | |
| Alternative Part (Replacement) | 97-3107A18-1P-417-940 | |
| Related Links | 97-3107A18, 97-3107A18-1P-417-940 Datasheet, Amphenol Industrial Distributor | |
![]() | DS2227-120 | IC NVSRAM 4MBIT 120NS 72SIMM | datasheet.pdf | |
![]() | TAGGRN | CAP PUSHBUTTON ROUND GREEN | datasheet.pdf | |
![]() | RG1608N-1400-B-T1 | RES SMD 140 OHM 0.1% 1/10W 0603 | datasheet.pdf | |
![]() | RG1608P-4121-C-T5 | RES SMD 4.12K OHM 1/10W 0603 | datasheet.pdf | |
![]() | TNPW0805432RBEEN | RES SMD 432 OHM 0.1% 1/8W 0805 | datasheet.pdf | |
![]() | VE-B1H-EU-F2 | CONVERTER MOD DC/DC 52V 200W | datasheet.pdf | |
![]() | VE-B5T-EV-S | CONVERTER MOD DC/DC 6.5V 150W | datasheet.pdf | |
![]() | RCL122512R7FKEG | RES SMD 12.7 OHM 2W 2512 WIDE | datasheet.pdf | |
![]() | LTC4000IGN-1#TRPBF | IC CHARGE MGMT MULTI CHEM 28SSOP | datasheet.pdf | |
![]() | 219-3-20800-845 | CIRCUIT BREAKER MAG-HYDR LEVER | datasheet.pdf | |
![]() | 0387490020 | Connector Barrier Block Strip 3 Circuit 0.438" (11.12mm) | datasheet.pdf | |
![]() | MSF4800B-20-1320 | SAFETY LIGHT CURTAIN | datasheet.pdf |