Ship from: HONGKONG
Date Code: Newest Date Code
Manufacturer lead time 6 weeks
Internal Part Number | EIS-CTV06RW-21-41PC | |
Lead Free Status / RoHS Status | Contains lead / RoHS non-compliant | |
Moisture Sensitivity Level (MSL) | 1 (Unlimited) | |
Production Status (Lifecycle) | In Production | |
Condition | New & Unused, Original Sealed | |
Standard Package | 1 | |
Category | Connectors, Interconnects | |
Family | Circular Connectors | |
Series | * | |
Weight | 0.001 KG | |
Application | Email for details | |
Alternative Part (Replacement) | CTV06RW-21-41PC | |
Related Links | CTV06RW, CTV06RW-21-41PC Datasheet, Amphenol Aerospace Operations Distributor |
H2ABG-10105-S4 | JUMPER-H1503TR/A2015S/H1501TR 5" | datasheet.pdf | ||
2026-23-C4F | GDT 230V 20% 20KA T/H FAIL SHORT | datasheet.pdf | ||
ISC1812RX120K | FIXED IND 12UH 265MA 1 OHM SMD | datasheet.pdf | ||
CMF55768R00DHEB | RES 768 OHM 1/2W .5% AXIAL | datasheet.pdf | ||
ANR81030 | 3 METER LM10 EXPANSION CABLE | datasheet.pdf | ||
430013-510 | PELTIER OT15,66,F0,1211,GG,W2.25 | datasheet.pdf | ||
8N4SV75EC-0064CDI | IC OSC VCXO 106.25MHZ 6-CLCC | datasheet.pdf | ||
RCL250E | POT 250 OHM 7.5W WIREWOUND LIN | datasheet.pdf | ||
09031966514 | DIN-SIGNAL C096MS-3 0C1-2-V2 | datasheet.pdf | ||
DSC1001DI1-014.7456 | OSC MEMS 14.7456MHZ CMOS SMD | datasheet.pdf | ||
MI-J7J-IA-F2 | DC/DC CONVERTER 36V 10W | datasheet.pdf | ||
0690493700 | CONDUCTOR ANVIL | datasheet.pdf |