Ship from: HONGKONG
Date Code: Newest Date Code
Manufacturer lead time 6 weeks
| Internal Part Number | EIS-CTV07RW-21-121PD-P1 | |
| Lead Free Status / RoHS Status | Contains lead / RoHS non-compliant | |
| Moisture Sensitivity Level (MSL) | 1 (Unlimited) | |
| Production Status (Lifecycle) | In Production | |
| Condition | New & Unused, Original Sealed | |
| Standard Package | 1 | |
| Category | Connectors, Interconnects | |
| Family | Circular Connectors | |
| Series | * | |
| Weight | 0.001 KG | |
| Application | Email for details | |
| Alternative Part (Replacement) | CTV07RW-21-121PD-P1 | |
| Related Links | CTV07RW-2, CTV07RW-21-121PD-P1 Datasheet, Amphenol Aerospace Operations Distributor | |
![]() | GMM22DTBN | CONN EDGECARD 44POS R/A .156 SLD | datasheet.pdf | |
![]() | 63784-1032 | METRAL 1000 HEADER ASSY | datasheet.pdf | |
![]() | LE B H3A-GWJW-23 | LED OSTAR PROJ 6CHIP 464NM BLUE | datasheet.pdf | |
![]() | RNF-100-1/2-CL-FSP | HEAT SHRINK TUBING 1=600FT | datasheet.pdf | |
![]() | 4TL32-3D | SWITCH TOGGLE 4PDT 15A 125V | datasheet.pdf | |
![]() | VI-JT4-EY | CONVERTER MOD DC/DC 48V 50W | datasheet.pdf | |
![]() | 3M2AM3-C-TNG | EM AWARE TNG ESD MONITOR KIT | datasheet.pdf | |
| UHW1V102MHD | CAP ALUM 1000UF 20% 35V RADIAL | datasheet.pdf | ||
![]() | CR0603-FX-3904ELF | RES SMD 3.9M OHM 1% 1/10W 0603 | datasheet.pdf | |
![]() | ATS-08F-42-C1-R0 | HEATSINK 57.9X60.96X22.86MM | datasheet.pdf | |
![]() | 10054652-10110TLF | CONN RECEPT SAS | datasheet.pdf | |
![]() | CTV07RW-11-2PB-LC | CTV 2C 2#16 PIN J/N RECP | datasheet.pdf |