Ship from: HONGKONG
Date Code: Newest Date Code
Manufacturer lead time 6 weeks
| Internal Part Number | EIS-ELM 4-365 | |
| Lead Free Status / RoHS Status | Lead free / RoHS Compliant | |
| Moisture Sensitivity Level (MSL) | 1 (Unlimited) | |
| Production Status (Lifecycle) | In Production | |
| Condition | New & Unused, Original Sealed | |
| Standard Package | 1,000 | |
| Category | Optoelectronics | |
| Family | LEDs - Spacers, Standoffs | |
| Series | ELM 4 | |
| Color | Black | |
| Length | 0.365" (9.27mm) | |
| LED | T1 | |
| Material | PVC | |
| Weight | 0.001 KG | |
| Application | Email for details | |
| Alternative Part (Replacement) | ELM 4-365 | |
| Related Links | ELM , ELM 4-365 Datasheet, Bivar, Inc. Distributor | |
![]() | 5142-333K | FIXED IND 33UH 1.28A 170 MOHM | datasheet.pdf | |
![]() | DF18C-50DS-0.4V(81) | CONN RECEPT 50POS DUAL 0.4MM SMD | datasheet.pdf | |
![]() | A1106EUA-T | IC SWITCH HALL EFFECT 3SIP | datasheet.pdf | |
![]() | WLRG-RA-DP101 | MODULE 802.11G RADIO AIRBORNE | datasheet.pdf | |
![]() | SN74ABT241ADWRE4 | IC BUFF/DVR TRI-ST DUAL 20SOIC | datasheet.pdf | |
![]() | S82J-01024AD | AC/DC CONVERTER 24V 10W | datasheet.pdf | |
![]() | VI-BWM-EY-F2 | CONVERTER MOD DC/DC 10V 50W | datasheet.pdf | |
![]() | 7109SCWCQE | SWITCH TOGGLE SPDT 5A 120V | datasheet.pdf | |
![]() | MU14-10RX | BUTTED SEAM HIGH TEMP RING TONGU | datasheet.pdf | |
![]() | 0385420212 | CONN RCPT 12POS PNL MNT SLDR | datasheet.pdf | |
![]() | ATS-17A-87-C2-R0 | HEATSINK 35X35X20MM R-TAB T766 | datasheet.pdf | |
![]() | DE0405-979SL151J 1KV | Capacitors Inductors Filters... | datasheet.pdf |