Ship from: HONGKONG
Date Code: Newest Date Code
Manufacturer lead time 6 weeks
| Internal Part Number | EIS-GTC01CFZ28-22P-025 | |
| Lead Free Status / RoHS Status | Lead free / RoHS Compliant | |
| Moisture Sensitivity Level (MSL) | 1 (Unlimited) | |
| Production Status (Lifecycle) | In Production | |
| Condition | New & Unused, Original Sealed | |
| Standard Package | 1 | |
| Category | Connectors, Interconnects | |
| Family | Circular Connectors | |
| Series | * | |
| Weight | 0.001 KG | |
| Application | Email for details | |
| Alternative Part (Replacement) | GTC01CFZ28-22P-025 | |
| Related Links | GTC01CFZ2, GTC01CFZ28-22P-025 Datasheet, Amphenol Industrial Distributor | |
![]() | BRPY1204W-TR | LED GREEN/RED CLEAR 1208 SMD | datasheet.pdf | |
![]() | TC1304-ZI0EUN | IC REG DL BCK/LINEAR SYNC 10MSOP | datasheet.pdf | |
![]() | 530758-4 | CONN RCTP 2ROW 60POS 26AWG GOLD | datasheet.pdf | |
![]() | ECM30DTMS-S189 | CONN EDGECARD 60POS R/A .156 SLD | datasheet.pdf | |
![]() | 2-1435834-0 | PATCHCORD CAT6 AMPTRAC WHITE 20' | datasheet.pdf | |
![]() | 20020008-D091B01LF | TERM BLOCK PLUG 9POS 3.81MM | datasheet.pdf | |
![]() | VI-24F-CW | CONVERTER MOD DC/DC 72V 100W | datasheet.pdf | |
![]() | 684P4ST2 | CABLE STR-R/A 4POS MALE/FMALE 2M | datasheet.pdf | |
![]() | FH34S-14S-0.5SH(99) | CONN FFC TOP 14POS 0.50MM R/A | datasheet.pdf | |
![]() | 40527-3666 | UNIV MAT TRIM KIT 36"X66" ALUM | datasheet.pdf | |
![]() | 71B36-02-2-05S | SWITCH ROTARY | datasheet.pdf | |
![]() | MAL219857221E3 | 220UF 450V 30X40MM 85C 15000H | datasheet.pdf |