Ship from: HONGKONG
Date Code: Newest Date Code
Manufacturer lead time 6 weeks
Internal Part Number | EIS-H2BBT-10105-W6 | |
Lead Free Status / RoHS Status | Lead free / RoHS Compliant | |
Moisture Sensitivity Level (MSL) | 1 (Unlimited) | |
Production Status (Lifecycle) | In Production | |
Condition | New & Unused, Original Sealed | |
Featured Product | DF3 Series | |
Standard Package | 10 | |
Category | Cable Assemblies | |
Family | Jumper Wires, Pre-Crimped | |
Series | DF3 | |
Contact End | Socket to Socket | |
Length | 5.0" (127.0mm) | |
Wire Gauge | 26 AWG | |
Contact Finish | Tin | |
Color | White | |
Contact Finish Thickness | - | |
Number of Rows | 1 | |
Number of Conductors | 1 | |
Weight | 0.001 KG | |
Application | Email for details | |
Alternative Part (Replacement) | H2BBT-10105-W6 | |
Related Links | H2BBT-1, H2BBT-10105-W6 Datasheet, Hirose Electric Co Ltd Distributor |
CPPLC4-HT06T | OSC 5.0V PROG CMOS TRI ST 100PPM | datasheet.pdf | ||
VS-ST333C08CFL0 | SCR PHASE CONT 800V 720A E-PUK | datasheet.pdf | ||
1590DF | BOX ALUM UNPAINTED 7.4"LX4.72"W | datasheet.pdf | ||
ERJ-S03F7152V | RES SMD 71.5K OHM 1% 1/10W 0603 | datasheet.pdf | ||
19844 | WRISTBAND JEWEL DUAL ONYX 4MM | datasheet.pdf | ||
VE-25B-IY-S | CONVERTER MOD DC/DC 95V 50W | datasheet.pdf | ||
VI-J7M-MY-F1 | CONVERTER MOD DC/DC 10V 50W | datasheet.pdf | ||
0011405395 | 63329A106 CONDUCTOR PUNCH | datasheet.pdf | ||
7789610020 | PAC-CTLX-HE20-V9 CBL ASSY | datasheet.pdf | ||
Y11213K32000B9R | RES SMD 3.32K OHM 1/4W 2512 | datasheet.pdf | ||
H301CGDL-140 | LED ASSY RA 3MM 2LVL GRN DIFF | datasheet.pdf | ||
CTV07RW-13-98JA | CTV 10C 10#20 SKT J/N RECP | datasheet.pdf |