Ship from: HONGKONG
Date Code: Newest Date Code
Manufacturer lead time 6 weeks
| Internal Part Number | EIS-H4BBG-10104-A6 | |
| Lead Free Status / RoHS Status | Lead free / RoHS Compliant | |
| Moisture Sensitivity Level (MSL) | 1 (Unlimited) | |
| Production Status (Lifecycle) | In Production | |
| Condition | New & Unused, Original Sealed | |
| Standard Package | 10 | |
| Category | Cable Assemblies | |
| Family | Jumper Wires, Pre-Crimped | |
| Series | DF13 | |
| Contact End | Socket to Socket | |
| Length | 4.0" (101.6mm) | |
| Wire Gauge | 26 AWG | |
| Contact Finish | Gold | |
| Color | Orange | |
| Contact Finish Thickness | - | |
| Number of Rows | 1 | |
| Number of Conductors | 1 | |
| Weight | 0.001 KG | |
| Application | Email for details | |
| Alternative Part (Replacement) | H4BBG-10104-A6 | |
| Related Links | H4BBG-1, H4BBG-10104-A6 Datasheet, Hirose Electric Co Ltd Distributor | |
![]() | RCB80DHBD | CONN EDGECARD 160PS R/A .050 DIP | datasheet.pdf | |
![]() | VJ1808Y332MXEAT5Z | CAP CER 3300PF 500V X7R 1808 | datasheet.pdf | |
![]() | A1BXB-5036M | IDC CABLE- ASR50B/AE50M/X | datasheet.pdf | |
![]() | ICS953008BFT | IC TIMING CTRL HUB P4 56-SSOP | datasheet.pdf | |
![]() | F1150AA03 | FILTER GEN PURPOSE/SGL PHASE 3A | datasheet.pdf | |
![]() | MCR03ERTF3323 | RES SMD 332K OHM 1% 1/10W 0603 | datasheet.pdf | |
![]() | RN60E1022BR36 | RES 10.2K OHM 1/4W .1% AXIAL | datasheet.pdf | |
![]() | PT81SM | CBL ASSY RG58A SMA MALE | datasheet.pdf | |
![]() | Y000766K0000T0L | RES 66K OHM 0.6W 0.01% RADIAL | datasheet.pdf | |
![]() | VLF504010MT-6R8M | FIXED IND 6.8UH 1.4A 190 MOHM | datasheet.pdf | |
| T55A685M010C0200 | CAP TANT POLY 6.8UF 10V 1206 | datasheet.pdf | ||
![]() | 3063523 | CABLE CATCH RAIL | datasheet.pdf |