Ship from: HONGKONG
Date Code: Newest Date Code
Manufacturer lead time 6 weeks
| Internal Part Number | EIS-M3URK-5036J | |
| Lead Free Status / RoHS Status | Lead free / RoHS Compliant | |
| Moisture Sensitivity Level (MSL) | ||
| Production Status (Lifecycle) | In Production | |
| Condition | New & Unused, Original Sealed | |
| Product Training Modules | Cable Matters | |
| Standard Package | 1 | |
| Category | Cable Assemblies | |
| Family | Rectangular Cable Assemblies | |
| Series | - | |
| Connector Type | Socket to Plug | |
| Number of Positions | 50 | |
| Number of Rows | 2 | |
| Pitch - Connector | 0.100" (2.54mm) | |
| Pitch - Cable | 0.050" (1.27mm) | |
| Length | 3.00' (914.40mm) | |
| Features | Polarizing Key, Strain Relief | |
| Color | Gray, Ribbon | |
| Shielding | Unshielded | |
| Usage | - | |
| Cable Termination | IDC | |
| Contact Finish | Gold | |
| Contact Finish Thickness | 30µin (0.76µm) | |
| Weight | 0.001 KG | |
| Application | Email for details | |
| Alternative Part (Replacement) | M3URK-5036J | |
| Related Links | M3URK, M3URK-5036J Datasheet, 3M Distributor | |
![]() | LP8345CLD-1.8/NOPB | IC REG LDO 1.8V 0.5A 6WSON | datasheet.pdf | |
![]() | 0260700000 | CONN CABLE CLAMP METAL PG 11 | datasheet.pdf | |
![]() | LM26LVCISD-115/NOPB | IC TEMP SENS/SWITCH 115C 6LLP | datasheet.pdf | |
![]() | 3-1734839-3 | CONN FPC TOP 33POS 0.50MM R/A | datasheet.pdf | |
![]() | RP10-1205DE/M1-HC | CONV DC/DC 10W 9-18VIN +/-05VOUT | datasheet.pdf | |
![]() | 562A022-4/86-0 | BOOT MOLDED | datasheet.pdf | |
![]() | DTS24F25-61AE | CONN HSG RCPT JAM NUT 61POS PIN | datasheet.pdf | |
![]() | LP3964EMP-2.5 | IC REG LDO 2.5V 0.8A SOT223-5 | datasheet.pdf | |
![]() | T29-9897-2-V | CIRCUIT BREAKER MAG-HYDR TOGGLE | datasheet.pdf | |
![]() | QR/P6-12S-C(02) | CONN SOCKET HOUSING 12 POS | datasheet.pdf | |
![]() | RDER73A152K2K1H03B | CAP CER 1500PF 1KV X7R RADIAL | datasheet.pdf | |
![]() | CTVPS00RF-17-26SC | CTV 26C 26#20 SKT RECP | datasheet.pdf |