Ship from: HONGKONG
Date Code: Newest Date Code
Manufacturer lead time 6 weeks
| Internal Part Number | EIS-C48-06R10-20P-106 | |
| Lead Free Status / RoHS Status | Contains lead / RoHS non-compliant | |
| Moisture Sensitivity Level (MSL) | 1 (Unlimited) | |
| Production Status (Lifecycle) | In Production | |
| Condition | New & Unused, Original Sealed | |
| Standard Package | 1 | |
| Category | Connectors, Interconnects | |
| Family | Circular Connectors - Housings | |
| Series | * | |
| Weight | 0.001 KG | |
| Application | Email for details | |
| Alternative Part (Replacement) | C48-06R10-20P-106 | |
| Related Links | C48-06R1, C48-06R10-20P-106 Datasheet, Bel Fuse Inc. Distributor | |
![]() | P1812-223K | FIXED IND 22UH 370MA 1.2 OHM SMD | datasheet.pdf | |
![]() | YC324-JK-0756RL | RES ARRAY 4 RES 56 OHM 2012 | datasheet.pdf | |
![]() | TNPW1206649RBEEN | RES SMD 649 OHM 0.1% 1/4W 1206 | datasheet.pdf | |
![]() | RNCF1206BKE301K | RES SMD 301K OHM 0.1% 1/4W 1206 | datasheet.pdf | |
![]() | RNCF0805BTT4K87 | RES SMD 4.87K OHM 0.1% 1/8W 0805 | datasheet.pdf | |
![]() | 1-284094-9 | TERM BLOCK RCPT WIRE 19POS R/A | datasheet.pdf | |
![]() | SJD112T4G | TRANS NPN DARL 100V 2A DPAK | datasheet.pdf | |
![]() | G195SMREVI6 | ACCY MAGN MOUNT 3/4 A195 RSMAM | datasheet.pdf | |
| 504PAA-ADAG | OSC PROG 8NS 50PPM 2X2.5MM | datasheet.pdf | ||
![]() | SJTP02RE-14-35SB(023)LC | CONN HSG RCPT 37POS BOX MNT SKT | datasheet.pdf | |
![]() | CTV07RW-25-19PA-LC | CTV 19C 19#12 PIN J/N RECP | datasheet.pdf | |
![]() | GRM36B104K10D500PTZ52 | Capacitors Inductors Filters... | datasheet.pdf |