Ship from: HONGKONG
Date Code: Newest Date Code
Manufacturer lead time 6 weeks
| Internal Part Number | EIS-CTV06RW-13-4H | |
| Lead Free Status / RoHS Status | Contains lead / RoHS non-compliant | |
| Moisture Sensitivity Level (MSL) | 1 (Unlimited) | |
| Production Status (Lifecycle) | In Production | |
| Condition | New & Unused, Original Sealed | |
| Standard Package | 1 | |
| Category | Connectors, Interconnects | |
| Family | Circular Connectors | |
| Series | * | |
| Weight | 0.001 KG | |
| Application | Email for details | |
| Alternative Part (Replacement) | CTV06RW-13-4H | |
| Related Links | CTV06R, CTV06RW-13-4H Datasheet, Amphenol Aerospace Operations Distributor | |
![]() | WM073RI,AL | BOX ABS ALMOND 6.88"L X 4.88"W | datasheet.pdf | |
![]() | MS3470W14-12SW | CONN RCPT 12POS WALL MNT W/SCKT | datasheet.pdf | |
![]() | PFS35-43RF1 | RES SMD 43 OHM 1% 35W TO263 DPAK | datasheet.pdf | |
![]() | TPS53311RGTR | IC REG BUCK ADJ 3A SYNC 16QFN | datasheet.pdf | |
![]() | MMB02070C6808FB200 | RES SMD 6.8 OHM 1% 1W 0207 | datasheet.pdf | |
![]() | B41821A7476M7 | CAP ALUM 47UF 20% 35V RADIAL | datasheet.pdf | |
![]() | B43821K2475M | CAP ALUM 4.7UF 20% 250V RADIAL | datasheet.pdf | |
![]() | D55342E07B38E3MWS | RES SMD 38.3K OHM 1% 1/4W 1206 | datasheet.pdf | |
![]() | FVX2-3-TOR | TAPE-ON TERMINAL | datasheet.pdf | |
![]() | V24B48T150BS3 | CONVERTER MOD DC/DC 48V 150W | datasheet.pdf | |
![]() | 40JR50 | RES 0.5 OHM 10W 5% AXIAL | datasheet.pdf | |
![]() | 10037402-11137LF | CONN FBDIMM DDR2 | datasheet.pdf |