Ship from: HONGKONG
								Date Code: Newest Date Code
								Manufacturer lead time 6 weeks
| Internal Part Number | EIS-CTV06RW-19-18SE | |
| Lead Free Status / RoHS Status | Contains lead / RoHS non-compliant | |
| Moisture Sensitivity Level (MSL) | 1 (Unlimited) | |
| Production Status (Lifecycle) | In Production | |
| Condition | New & Unused, Original Sealed | |
| Standard Package | 1 | |
| Category | Connectors, Interconnects | |
| Family | Circular Connectors | |
| Series | * | |
| Weight | 0.001 KG | |
| Application | Email for details | |
| Alternative Part (Replacement) | CTV06RW-19-18SE | |
| Related Links | CTV06RW, CTV06RW-19-18SE Datasheet, Amphenol Aerospace Operations Distributor | |
![]()  | MPS3904,126 | TRANS NPN 40V 0.1A TO92 | datasheet.pdf | |
![]()  | 11TS115-1 | SWITCH TOGGLE SPDT 20A 125V | datasheet.pdf | |
![]()  | LB1862MC-AH | IC MOTOR DRIVER ON/OFF 10MFPSK | datasheet.pdf | |
![]()  | M39003/01-5428 | CAP TANT 1.5UF 5% 20V AXIAL | datasheet.pdf | |
![]()  | 7201MPDAV2ME | SWITCH TOGGLE DPDT 5A 120V | datasheet.pdf | |
![]()  | 78F560J-RC | FIXED IND 56UH 195MA 2.95 OHM TH | datasheet.pdf | |
![]()  | MAX4372HESA-T | IC OPAMP CURR SENSE 200MHZ 8SOIC | datasheet.pdf | |
![]()  | 70151-1040 | SAFETY EDGE | datasheet.pdf | |
![]()  | 18054-CS | TWEEZER POINT ULTRAFINE 3C 4.25" | datasheet.pdf | |
![]()  | SMMSZ5260BT1G | DIODE ZENER 43V 500MW SOD123 | datasheet.pdf | |
![]()  | MS27473E22F55PA | JT 55C 55#20 PIN PLUG | datasheet.pdf | |
![]()  | 97-3107B24-28PX | AB 24C 24#16 PIN PLUG | datasheet.pdf |